The project

APC by Schneider Electric battery build for large data centre in Dublin

The background

Our client, working on behalf of a global online retailer, required a large-scale battery installation to support 26 Galaxy 400 kVA UPS across three sites.

The solution

As this project was across three different sites in the ROI, our Project Manager was key to ensuring the entire project ran smoothly. He coordinated a team of four Field Service Engineers as well as casual labour, designed the technical plan, method statements, risk assessments and managed suppliers. The installation of the three strings of 40 batteries for each UPS across all three sites was completed on schedule.

The Results

Working as a tight and organised team, we met all deadlines of this important project lasting many weeks. The client chose Continu as we are now regarded as battery build experts. APC also chose Continu for our attention to detail and strict adherence to site safety, together with unrivalled knowledge and experience.